Assessment objectives
Each square is one assessment objective, colored by the evidence in the log. Select a control to review it.
Maintenance activity by week
Off-site equipment custody
Every CUI-bearing item that leaves the building needs a sanitization record (MA.L2-3.7.3).
Completion by activity type
Tool registry health
Highest-priority findings
Maintenance log
One record per work order. Assessors sample these records, so capture who did the work, who supervised, which tools were used, and how remote sessions and off-site equipment were handled.
Maintenance controls
The suggested result comes from the log and findings. Set the final status yourself after examining the evidence and interviewing the staff.
Maintenance personnel
Anyone who performs maintenance. People without the required access authorization must be supervised by someone who has it (MA.L2-3.7.6).
Maintenance vendors
Third parties that service in-scope equipment on site, remotely, or at a depot.
Approved maintenance tools
Software, hardware, and diagnostic media used for maintenance. Software and media must be checked for malicious code before use (MA.L2-3.7.4).
Findings
Checks run whenever the log, tools, or personnel change. Dismiss a finding once it is resolved or formally accepted.
Maintenance program
The written program the log is measured against. Changes save automatically.
Preventive maintenance schedule
Emergency maintenance procedure
Risk register
Recommendations and next steps
Attestation
An internal attestation for this report. It is separate from the annual CMMC affirmation a senior official submits in SPRS.
Settings
Changes save automatically. The reporting period sets the range of the dashboard and the printed report.
A blank report keeps personnel, vendors, tools, and the schedule, and clears the log, risks, and attestation, so students can build the record from a scenario.